High-load systems and infrastructure optimization
Optimization for millions of users and hundreds of millions of records. Database migration, CI/CD, test coverage and resilient operations.
Why growing systems slow down and fail
Legacy architecture and weak operational practices can turn growth into a risk.
The database fails under load
Hundreds of millions of records and millions of users overwhelm the existing database setup. Queries take seconds, replicas lag and the system experiences downtime.
Manual deployments introduce production bugs
Without CI/CD, test environments and automated build checks, every release is unpredictable. Customers find bugs before tests do, and rollbacks take hours.
Infrastructure consumes the budget
Adding servers does not solve the underlying problem. Capacity costs increase without better performance, and resource usage remains unclear.
Catalogs and traffic cannot scale
Is 30,000 SKUs the limit? New items break 1C synchronization, traffic spikes bring the site down and the architecture cannot scale horizontally.
Optimization: from assessment to stable operations
A clear process with measurable results at every step. Typical duration: 3–6 months.
Infrastructure assessment and load testing
We examine architecture, database bottlenecks, caching and indexes, then run load tests to find failure points before users encounter them.
Target architecture design
We design the database schema, sharding or replication strategy, Redis caching and microservice boundaries. We assess total cost of ownership to balance performance and cost.
Migration and optimization
We migrate data with minimal downtime or, where feasible, without interruption. We optimize queries, configure indexes, introduce caching and scale catalogs and synchronization.
CI/CD, monitoring and operations handover
We automate builds, tests and deployment, configure Prometheus and Grafana monitoring and alerts, and train your team to operate the new infrastructure.
Example deliverable: infrastructure before and after
You receive documented architecture and specific improvement metrics.
MongoDB to PostgreSQL migration and infrastructure optimization
A system serving four million users and storing hundreds of millions of laboratory test records. Database replacement and architecture changes reduced server resource requirements by a factor of 16 while improving performance.
Before optimization
After optimization
For businesses with annual revenue of RUB 500 million or more · NDA available
Frequently asked questions
Can the migration happen without stopping the system?
We can use dual writes or logical replication to keep the new database synchronized with the current one. The cutover approach and expected interruption are agreed after assessing the system.
Which database do you recommend for high-load projects?
For structured data with complex relationships, we consider PostgreSQL with partitioning and read replicas. For document-oriented workloads, MongoDB with suitable sharding may fit. The choice depends on the workload identified during the assessment.
How long does a typical optimization project take?
Assessment and load testing take 2–3 weeks. Database migration and optimization take 2–4 months. The full process with CI/CD and monitoring takes 3–6 months. Vitagramma took six months including comprehensive test coverage.
What is CI/CD, and why does it matter for the business?
CI/CD automates building, testing and deploying code. Repeatable checks and release procedures make frequent updates more practical, shorten time to market and reduce manual release errors.
